doc: process: Correct and expand slightly on the Merge Window concept

For quite a long time we've been using a 3 week, rather than 2 week,
merge window as it was only 2 weeks during the timeframe where we did 2
month rather than 3 month releases.  This corrects the places that still
had 2 weeks and tries to make things a bit clearer overall.

Cc: Heinrich Schuchardt <xypron.glpk@gmx.de>
Signed-off-by: Tom Rini <trini@konsulko.com>
diff --git a/doc/develop/process.rst b/doc/develop/process.rst
index 4ba4bb2..0ef24e8 100644
--- a/doc/develop/process.rst
+++ b/doc/develop/process.rst
@@ -8,8 +8,8 @@
 
 * Development happens in Release Cycles of 3 months.
 
-* The first 2 weeks are called Merge Window, which is followed by a
-  Stabilization Period.
+* The first 3 weeks of the cycle are referred to as the Merge Window, which is
+  followed by a Stabilization Period.
 
 * Patches with new code get only accepted while the Merge Window is open.
 
@@ -27,7 +27,7 @@
 <https://www.denx.de/wiki/U-Boot/ReleaseCycle>`_.  A Release Cycle lasts
 normally for three months.
 
-The first two weeks of each Release Cycle are called *Merge Window*.
+The first three weeks of each Release Cycle are called *Merge Window*.
 
 It is followed by a *Stabilization Period*.
 
@@ -36,8 +36,9 @@
 Merge Window
 ------------
 
-The Merge Window is the period when new patches get submitted
-(and hopefully accepted) for inclusion into U-Boot mainline.
+The Merge Window is the period when new patches get submitted (and hopefully
+accepted) for inclusion into U-Boot mainline. This period lasts for 21 days (3
+weeks) and ends with the release of ``"-rc1"``.
 
 This is the only time when new code (like support for new processors or new
 boards, or other new features or reorganization of code) is accepted.